Purnell Energy

The Challenge:

Nathan Purnell was looking for a building durable enough to us as a paint booth, and which was also possible to disassemble and relocate if need be in the future.

Deadlines were tight as well. Nathan needed to have the shop up and running in 2-3 months but ran into an issue with the airport next door and a missed permit application. This delayed the estimated project timeline by two weeks.

The Solution:

Nathan chose Calhoun based on the value of the building and install proposal, as well as the option to be able to install his building on top of shipping containers. The containers were also used for additional storage space.

During the unforeseeable delays, Calhoun and dealer partner, Cobra, kept in constant communication with the customer so there was complete transparency throughout the entire process.

Share this Project:
Location
Grand Prairie, AB
Industry
Mining, Oil & Gas
Size
62 x 120
Series
CC Series
Year
2017